News Flash

Posted on: January 8, 2019

2019 Park and Trail Projects

Park Plans 2019

Please note:  The graph below was included in the Draper Forward Jan. 2019 newsletter.  There was an error on the cost of the Coyote Hollow Trail Head project.  The correct cost estimate for that project is $500,000.

Read on...

1.Top Draper News Stories - Home
Posted on: January 8, 2019

Disaster Simulation Game Planned on January 26

Disaster Simulation Event

The Draper City Emergency Preparedness Committee has planned a Disaster Simulation Game and invites all residents over the age of 12 to participate.

1.Top Draper News Stories - Home
Posted on: January 8, 2019

Snow Tips

Snow photo

With the winter season heavily upon us, here are some helpful tips.

* Remember, do not park a vehicle or trailer on the street during the winter. The snow plows need to be able to clear the street.  Move vehicles onto your property instead of in t...

Read on...

1.Top Draper News Stories - Home
Posted on: January 8, 2019

Historic Preservation Commission Presents Painting to Mayor

Painting of Fort for Mayor

The Draper Historic Preservation Commission presented to Mayor Walker a beautiful painting of the historic Draper Fort. The painting was done by Frank Thomas, Wild Goose Studio. It is absolutely beautiful. If you would like to see the painting for yoursel...

Read on...

1.Top Draper News Stories - Home
Posted on: December 6, 2018

Construction Notice: 13800 South

Construction-notice

Starting on Monday, December 10, 13800 South Street will be reduced to one lane at the canal crossing (470 East) during daytime hours. The canal will be widened to accommodate the construction on 138th scheduled for next year. This section will be control...
Read on...

1.Top Draper News Stories - Home